Extraction
Execute extraction plan
After the mine design stage, the next necessary and decisive step in the extraction, correct and efficient implementation of the plan is designed.
The importance of this part is that if there is a discrepancy in the implementation of the plan with the original designed plan, all planning and secondary arrangements in the mine will be affected and the plan will lose its effectiveness.
Therefore, the implementation of the plan by experts in the field of mining is very important in saving the cost of mining and preventing damage caused by the incorrect implementation of the mining plan on which the planning is based.

Ongoing-projects
- Design and extraction of Hashim Abad iron ore mine in Isfahan province
- Design and extraction of Nafis lead and zinc mine in South Khorasan province
Experience
-
Shahreza dolomite mine in Isfahan province with a production capacity of 300,000 tons per year
-
Khaybar iron ore mine in Yazd province with a a production capacity of 300,000 tons per year
-
Seftijan iron ore mine in Isfahan province with a minimum production of 10,000 tons of iron ore per month
- Design of marble extraction from Pouria Vali marble mine in Isfahan province with a minimum production of 7000 tons of per month
- Design of Abbasabad silica mine in Lorestan province with a minimum production of 6000 tons of silica per month
- silica per month Extraction design from Talgestan barite mine of Isfahan province with minimum production of 2000 tons of crystal barite and drilling barite and 6000 tons of jig barite per month